The Final Parabola

Welcome to what I believe to be my ultimate endgame Bitcoin thesis - The Final Parabola.

The Final Parabola

The Final Parabola

I'm not sure how long this will take to play out. But I have a feeling it will take shape within a decade. Even sooner than that perhaps.

So, what is The Final Parabola?

Take a look at the current Bitcoin price chart, on a logarithmic scale:

BTC price chart

BTC price chart

Notice how the price is shaped like a logarithmic curve?

Logarithmic Curve

Logarithmic Curve

Some people use this fact to extrapolate that the future Bitcoin price will follow a log curve forever:

Bitcoin Log Curve

Bitcoin Log Curve

The explanation given for this is typically diminishing returns and lengthening cycles. More specifically, that:

However, I think the Bitcoin logarithmic curve model only works in the short-term, and will be wrong in the long-term. Instead, I think the Bitcoin price chart will eventually take this shape:

Flipped S-Curve

Flipped S-Curve

I'm not talking about the specific dimensions. I'm simply talking about the overall shape. While the logarithmic curve follows diminishing returns forever, the flipped S-curve shape I'm showing here reaches an inflection point where it turns into a parabola. This is what I'm referring to when I say "the final parabola".

The Final Parabola Labeled

The Final Parabola Labeled

So why do I think we will see a final parabola on the Bitcoin price chart?

First of all, the logarithmic curve model simply doesn't make sense to me when it comes to how I think Bitcoin will be adopted by the masses:

That's where my idea comes in. The reasoning for my idea begins with the adoption S-curve, which refers to the stages of adoption of a new product. Notice the inflection point labeled near the bottom of the curve in blue:

Adoption S-Curve

Adoption S-Curve

The S-curve becomes more interesting when we combine it with a population distribution of market participants:

Adopters S-Curve

Adopters S-Curve

Currently, I believe we are still in the "Innovators" section of Bitcoin adoption as money. Here's some justification for that:

How is the inflection point related to adoption?

So, what new force am I looking for? I'm looking for the inflection point.

The inflection point is where the adoption rate suddenly seems to change... from gradually, to suddenly. Sound familiar?

Take another look at this diagram. Notice how the adoption is really slow before the inflection point, but becomes significantly quicker after the inflection point?:

Adoption Rate Picking Up After Inflection Point

Adoption Rate Picking Up After Inflection Point

It may have taken a decade just to get through the "Innovators" stage and near the inflection point. But the rest of the adoption will happen at a much, much faster rate. Such is the parabolic nature of the S-curve, and the viral nature of Bitcoin.

What will this force of rapid adoption look like? I know exactly what it will look like - mass market euphoria. Animal spirits. Green candles. FOMO. That force that we are all so familiar with. The force that made all of us FOMO into Bitcoin in the first place.

What will the trigger be for this force to take over the world? Well, it turns out that FOMO is actually a self-reinforcing force. It started from nothing and created an ever-growing history of repeated Bitcoin ATHs. Even left untouched, it will take over the entire world on its own. However, a sudden loss of confidence around the world in the dollar system could be a catalyst that speeds it up. And in fact, a loss of confidence in the dollar system is exactly what motivated Satoshi to create Bitcoin. Funny how that works.

Anyways, regardless of the exact sequence of events, eventually the final parabola will happen. We know it'll happen because eventually the whole world will realize that they shouldn't have confidence in the dollar system. This will lead to the parabola where the whole world onboards to Bitcoin by FOMOing into it. The parabola which is depicted in the second half of the S-curve.

What does the inflection point look like on the price chart?

I believe the inflection point on the adoption curve is the same as the center point on the flipped S-curve shape. To give a complete picture, I've made a complete diagram overlaying the flipped S-curve shape with the adoption curve:

The Complete Diagram

The Complete Diagram

So far it's been around 14 years since Bitcoin was created. During this time, we've been in the left side of the above diagram.

I think we may soon enter the right side of the shape. And in fact, we may have actually already entered it very recently.

So, to put everything together, what does my vision for the eventual BTC price chart look like? Well, I can't give exact timeframes, but it might look something like this:

My Prediction

My Prediction

Let me give a specific timeframe prediction. I predict, with 80% certainty, that the inflection point is within 1.5 years of today - July 4, 2023. The backwards border is determined from Feb 24 2023, which is the date when Russia began its SMO to invade Ukraine. This ultimately led to the West stealing Russia's forex reserves, making the entire world lose confidence in the dollar monetary system. The forward border is determined as approximately one year after the upcoming March 2024 halvening. Halvenings typically require some time to create the parabolas that they usually create. Finally, there are also many important events within this range, such as the ongoing US banking crisis and the upcoming 2024 US presidential election. So, taking all those macro events into account, that's my 3-year range for the inflection point with an 80% certainty.

Closing Thoughts

Bitcoin might just be the most viral product ever created - the product of sound money. A product that literally every person on this planet desperately needs. I think that means the S-curve and adoption rate is going to be ridiculously, ridiculously vertical.

Remember. Bitcoin started at 0 against the dollar. And the dollar is eventually going to 0 against Bitcoin. That's not hyperbole. My idea ties those two events together into a harmonious geometric shape on the price chart using the idea of the adoption S-curve.

Final notes:

Let's see what happens - gradually, then suddenly.

Bookkeeping

Thanks to all my fellow Bitcoiners who provided ideas that I built off of to create The Final Parabola idea.

If you want The Final Parabola to happen, share this message to everyone you know so they all know what is coming. We are the ones who will make The Final Parabola happen.

The Final Parabola

What are the odds?

And don't forget, this is what comes after The Final Parabola:

A message from Morpheus

A message from Morpheus.